| THE SIGNAL BOX |
BRANCH LINES |
MIDLAND ROTARY INTERLOCKING BLOCK
|
![]() |
Midland Railway Rotary Interlocking Block Instruments Pegging Instrument (left), used by the signalman at the "accepting" end of the section, and non-pegging instrument (right), used by the "sending" signalman. These early photographs show the additional feature originally provided to allow the block needle to be waggled to indicate the routing of the train. (see below) |
![]() |
The principle of applying interlocking between signals was achieved by means of "Rotation Locking" between the levers. This achieved exactly the same as the Sykes system but carried out by the lever frame's own interlocking and without the complex and expensive instruments. Rotation locking was not generally provided where track circuits existed, and was often removed from when track circuiting was later added.
At some locations, the rotation locking was applied to shunt signals, too. If a signalman pulled a wrong lever in error, it was often necessary to shunt the imaginary train (that the locking thought was there) around until it was deposited in a siding!
A further feature, provided on the original instruments in complex areas, was a legacy from single-needle telegraph days and also could be found on the conventional three-position blocks of the Midland Railway. On the non-pegging instrument, which was converted from a redundant single-needle instrument, the handle was retained and could be used to waggle the block needle to indicate to the adjacent signalman (in code) the destination of the train.
The pegging instruments had a small key below the commutatior handle to acknowledge messages.
These operations apparently used a much lesser voltage for the operation, to ensure that activity did not, for instance, activate the "Line Clear" release on a Stating signal. These were taken out of use in LMS days (probably through difficulty establishing suitable voltages when intermediate boxes switched out), and superseded by routing bell signals.
The key was removed from all of the pegging instruments and the space panelled over, although the non-pegging instruments generally retained their non-working handles to the end.
It seems to have been recognised that where busy boxes existed with short block sections, the train might pass over the release treadle before the signalman has turned the instrument to "Train on Line" and therefore not release the instrument.
I don't know how long it took them to discover this, but it is an interesting point that the Company recognised that Rules and Regulations can sometimes be difficult to implement "by the book". Perhaps it was the lineman's order for 500 glass seals that did it!
Anyway, a special version of the instrument was provided for short block sections where the treadle would release the instrument whether at "Line Clear" or "Train on Line". As the release worked on two-thirds of the full circle of the instrument, these became known as Long Segment instruments.
It's really easy to remember - short segments for long sections and long segments for short sections. Despite this risk of confusion, and the occasional need to replace an instrument, I know of no occasion where the wrong type was fitted. However, I have seen two such instruments in ex-works condition wrongly labelled!
Use of Rotary Block instruments, which must have been quite expensive, was widespread on busy sections of line. For instance, every block section on the passenger lines between St. Pancras and St. Albans South was provided with these instruments.
Piecemeal provision was also carried out following accidents, for instance, after the famous Hawes Junction collision of Christmas Eve, 1910.
The LMS made modifications to some instruments in the 1930s to prevent the instrument being turned to "Line Clear" if the distant signal was not correctly in the "on" position. This could be released by another glass-covered plunger when necessary. This release later became redundant when it was decreed that in the case of such a signal failure, working should be in accordance with a block failure.
The only time the instruments would become unsafe would be if the Train on Line release glass was missing. This became more commonplace in later years as with higher train speeds and consequent hammering of the track, treadles would frequently become defective or out of adjustment. Additionally, a diesel shunting engine, or a fast moving light diesel engine would not always activate the treadle.
However, any secure system poses a challenge to a wily signalman, and the following cheating methods are known of:
Use of these illegal methods was always, of course, to overcome failures rather than to achieve two trains in a section - any signalman caught in the act would have his career abruptly terminated.
Nevertheless, the instruments stood the test of time and usually worked well. From a signalman's point of view they were reliable and could be trusted.
So reliable they were, in fact, that a white diamond would be fitted to the post of home signals even if track circuits were not provided. The interlocking of the instrument was considered sufficient to exempt drivers from having to immediately remind the signalman of their presence.
Was there any other instrument in the running? Not really. The majority of railway companies settled for conventional three position blocks, with add-ons auch as "line clear, one pull", Welwyn Control and Track Circuiting. A few laboured on with primitive one-wire, two position blocks and a few of these survived into the late eighties or early nineties.
The Metropolitan Railway standardised on Spagnoletti Lock & Block, which was similar to that used by the Great Western but with treadle releases to confirm the train had left the section. They were not as effective as the Midland's Rotary block in that there was no "Line Clear Cancel" facility.
I understand there was a form of Rotary Interlocking block used between Watford No2 and Watford Tunnel North End on the former L&NWR main line. From descriptions from former signalman, these do not appear to be standard Midland instruments but I have no other details. Can anybody clarify the situation?
The majority of Midland Rotary Interlocking Blocks were installed on busy lines that have subsequently been resignalled, so very few survive. The last-surviving examples were at odd locations on the Settle & Carlisle line, but these were finally removed on 11th September 2002 owing to a lack of spares for them.
Rotary Interlocking Block is no more.
Comments about this article should be addressed
to John Hinson